How we work
From your first idea to a working system.
A clear process for planning, installation and ongoing support.
Five steps. One clear plan.
-
01 · Your needs
Your needs
We start with your power requirements: site details, daily energy use and backup priorities.
You get: A project brief
- Location and available roof or land area
- Appliances, operating hours and electricity bills
- Budget and backup expectations
-
02 · Site review
Site review
Before designing anything we look at the site itself: space, shading, access and the existing electrical connection.
You get: Site requirements that guide the design
- Roof or land condition and access
- Shading for solar, or wind exposure for turbines
- Electrical connection and where equipment will go
-
03 · Design & estimate
Design & estimate
You review the plan and the equipment: capacity, specifications and an itemised estimate with payback.
You get: An agreed scope and equipment list
- Generation, inverter and storage sizing
- Equipment choices and their costs
- Installation scope, exclusions and net-metering approvals
-
04 · Installation
Installation
A certified technician schedules the work, mounts and wires the system, tests it and hands it over.
You get: A tested system and handover records
- Schedule based on site readiness and equipment availability
- Mounting, wiring and equipment installation
- Commissioning checks and operating guidance
-
05 · Aftercare
Aftercare
Your project information stays in one place, with ongoing support when you need it.
You get: A clear point of contact for support
- Order status and installation documents
- Equipment and warranty records from handover
- Support requests through your customer workspace
Before we begin
Having these ready makes the first conversation faster:
- Project location (division, district, upazila)
- A recent electricity bill or a list of appliances
- Photos of the roof or site
- Your budget and backup needs
Requirements first
We review the site and your energy needs before choosing components.
Visible equipment costs
Compare specifications and build an itemised component list with real Bangladesh prices.
A connected workspace
Updates, documents and support requests in one place.
Frequently asked questions
Do I need to know my system size first?
No. Start with your appliances and how many hours a day you use them — or your monthly bill. The planner turns that into a first estimate with equipment, cost and payback.
What should I prepare for the first discussion?
Your location, a recent electricity bill or appliance list, photos of the roof or site, and your backup priorities.
When is the installation date confirmed?
After the site review, once equipment availability and the installation scope are settled.
Can I use net metering?
Yes, for grid-connected systems. Under the Net Metering Guideline 2025 you can install up to your sanctioned load; surplus units are credited each quarter. We prepare the paperwork with your utility.
How do I pay?
Online through SSLCommerz (cards, bKash, Nagad, bank) or cash on delivery after inspection where available.
Ready for your first step?
Bring your location, a bill or appliance list, and your priorities.