Plan a project

  1. Site & weather
  2. Energy needs
  3. System & checkout
System

Energy source

Grid connection

Location

After choosing a division or district, update the list to see its areas.

Roof and mounting

Not needed for wind-only systems.

Wind and hybrid only. Higher masts reach stronger wind.

Electricity connection

Used to work out your bill and savings at the current BERC rates.

Printed on your electricity bill. Net metering allows solar up to this load. Leave empty if unsure.

Hybrid-grid only. Sizes the battery for your essential loads.